How can I change the shape of the task bar

With Exg2antt1
With .Chart.Bars.Copy("Task","T2")
.StartShape = exontrol.EXG2ANTTLib.ShapeCornerEnum.exShapeIconDown1
.StartColor = Color.FromArgb(255,0,0)
End With
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#)
.AddBar(.AddItem("Item 2"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
699
|
How can I change the starting shape for all task bars

With Exg2antt1
With .Chart.Bars.Item("Task")
.StartShape = exontrol.EXG2ANTTLib.ShapeCornerEnum.exShapeIconUp1
.StartColor = Color.FromArgb(255,0,0)
End With
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
698
|
How can I change the height of the task bar

With Exg2antt1
.Chart.Bars.Copy("Task","T2").Height = 17
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#)
.AddBar(.AddItem("Item 2"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
697
|
How can I change the height for all task bars

With Exg2antt1
.Chart.Bars.Item("Task").Height = 17
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
696
|
How can I change the color of the task bar

With Exg2antt1
.Chart.Bars.Copy("Task","T2").Color = Color.FromArgb(255,0,0)
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#)
.AddBar(.AddItem("Item 2"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
695
|
How can I change the color for all task bars

With Exg2antt1
.Chart.Bars.Item("Task").Color = Color.FromArgb(255,0,0)
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
694
|
How can I change the shape for all task bars

With Exg2antt1
.Chart.Bars.Item("Task").Shape = exontrol.EXG2ANTTLib.ShapeBarEnum.exShapeSolidDown
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
693
|
How can I change the shape of the task bar

With Exg2antt1
.Chart.Bars.Copy("Task","T2").Shape = exontrol.EXG2ANTTLib.ShapeBarEnum.exShapeThinCenter
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#)
End With
End With
|
692
|
How can I change the pattern or style for all task bars

With Exg2antt1
.Chart.Bars.Item("Task").Pattern = exontrol.EXG2ANTTLib.PatternEnum.exPatternFDiagonal
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
691
|
How can I change the pattern of the task bar

With Exg2antt1
.Chart.Bars.Copy("Task","T2").Pattern = exontrol.EXG2ANTTLib.PatternEnum.exPatternFDiagonal
.Chart.FirstVisibleDate = #1/1/2001#
.Columns.Add("Column")
With .Items
.AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#)
End With
End With
|
690
|
How can I add a percent bar in the chart area, so the task bar is splited for non working days or hours

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.Bars.Add("Task%Progress:Split").Shortcut = "TS"
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"TS",#1/2/2001#,#1/16/2001#,"P1")
.set_ItemBar(h,"P1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.14)
.set_ItemBar(h,"P1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True)
End With
End With
|
689
|
How can I add a bar in the chart area, so the task bar is splited for non working days or hours

With Exg2antt1
.Columns.Add("Task")
.Chart.Bars.Add("Task:Split").Shortcut = "TS"
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"TS",#1/2/2001#,#1/16/2001#)
End With
End With
|
688
|
How can I add a split bar in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Split",#1/2/2001#,#1/6/2001#)
End With
End With
|
687
|
How can I add a progress bar in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Progress",#1/2/2001#,#1/6/2001#)
End With
End With
|
686
|
How can I add a milestone bar in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Milestone",#1/2/2001#,#1/2/2001#)
End With
End With
|
685
|
How can I add a summary bar in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Summary",#1/2/2001#,#1/6/2001#)
End With
End With
|
684
|
How can I add a project summary bar in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Project Summary",#1/2/2001#,#1/6/2001#)
End With
End With
|
683
|
How can I add a deadline bar in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Deadline",#1/2/2001#,#1/2/2001#)
End With
End With
|
682
|
How can I add a task bar in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
681
|
How can I assign a picture or an icon to a bar in the chart

Dim h
With Exg2antt1
.set_HTMLPicture("p1","c:\exontrol\images\zipdisk.gif")
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.set_ItemHeight(h,48)
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<img>p1</img>")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarHAlignCaption,2)
End With
End With
|
680
|
How can I assign a picture or an icon to a bar in the chart

Dim h
With Exg2antt1
.Images("gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _
"lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _
"0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _
"NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=")
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<img>1</img>")
End With
End With
|
679
|
How can I display or add an anchor or a hyperlink in the link

Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1")
.AddItem("")
.AddItem("")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"just <a1>link</a>")
End With
End With
|
678
|
How can I display a picture or an icon on the link

Dim h1,h2
With Exg2antt1
.Images("gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _
"lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _
"0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _
"NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=")
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1")
.AddItem("")
.AddItem("")
.AddItem("")
.AddItem("")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"just <img>1</img> link")
End With
End With
|
677
|
How can I display a picture or an icon on the link

Dim h1,h2
With Exg2antt1
.set_HTMLPicture("pic1","c:\exontrol\images\zipdisk.gif")
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1")
.AddItem("")
.AddItem("")
.AddItem("")
.AddItem("")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"<img>pic1</img><br><br>just a link")
End With
End With
|
676
|
How can I display some HTML text or caption on link

Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"L<b>1</b>")
End With
End With
|
675
|
How can I assign a tooltip to a link

Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"L<b>1</b>")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkToolTip,"This is a bit of text that's shown when the cursor hovers the link")
End With
End With
|
674
|
Can I change the width or the size of the link

Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStyle,0)
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkWidth,2)
End With
End With
|
673
|
Can I change the style of the link

Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStyle,4)
End With
End With
|
672
|
Can I change the color of the link

Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkColor,255)
End With
End With
|
671
|
Can I change the part of the bar where the link ends

Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStartPos,1)
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkEndPos,1)
End With
End With
|
670
|
Can I change the part of the bar where the link starts

Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStartPos,0)
End With
End With
|
669
|
How can I associate an extra data to a link
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkUserData,"your data")
End With
End With
|
668
|
How can I show or hide a specified link
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkEndBar,False)
End With
End With
|
667
|
How can I get the key of the bar where the link end
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.AddItem(.get_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkEndBar))
End With
End With
|
666
|
How can I get the key of the bar where the link starts
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.AddItem(.get_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStartBar))
End With
End With
|
665
|
How can I get the handle of the item where the link ends
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.AddItem(.get_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkEndItem))
End With
End With
|
664
|
How can I get the handle of the item where the link starts
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.AddItem(.get_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStartItem))
End With
End With
|
663
|
How can I enumerate the links in the chart
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.AddLink("L2",h2,"K2",h1,"K1")
.AddItem(.FirstLink)
.AddItem(.get_NextLink(.FirstLink))
End With
End With
|
662
|
How can I access the properties and method of the link between two bars
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"L<b>1</b>")
End With
End With
|
661
|
How can I remove a link between two bars
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.ClearLinks()
End With
End With
|
660
|
How can I remove a link between two bars
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
.RemoveLink("L1")
End With
End With
|
659
|
How do I add a link between two bars

Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.AddLink("L1",h1,"K1",h2,"K2")
End With
End With
|
658
|
How do I ungroup the bars in the chart
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.GroupBars(h1,"K1",True,h2,"K2",True)
.GroupBars(h1,"K1",False,h2,"K2",False)
.UngroupBars(h1,"K1",h2,"K2")
End With
End With
|
657
|
How do I group one or more bars in the chart, so they are moved together
Dim h1,h2
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h1 = .AddItem("Task 1")
.AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1")
h2 = .AddItem("Task 2")
.AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2")
.GroupBars(h1,"K1",True,h2,"K2",True)
.GroupBars(h1,"K1",False,h2,"K2",False)
End With
End With
|
656
|
How do I find the number or count of bars in the item
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/1/2001#,#1/2/2001#,"K1")
.AddBar(h,"Task",#1/4/2001#,#1/6/2001#,"K2")
.set_ItemBar(h,"K2",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,.get_ItemBar(h,"<*>",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarsCount))
End With
End With
|
655
|
How can I assign any extra data to a bar in the chart
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarData,"your data")
End With
End With
|
654
|
How can I enable or disable resizing the percent value of a progress bar, at runtime

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.Bars.Add("Task%Progress").Shortcut = "Percent"
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.35)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanResizePercent,False)
End With
End With
|
653
|
Is there any way to change the background color for percent value being displayed on the progress bar

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.Bars.Add("Task%Progress").Shortcut = "Percent"
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.35)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercentCaptionFormat,"<bgcolor=FF0000> %p%</bgcolor>")
End With
End With
|
652
|
Is there any way to change the color for percent value being displayed on the progress bar

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.Bars.Add("Task%Progress").Shortcut = "Percent"
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.35)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercentCaptionFormat,"<fgcolor=FF0000>%p%</fgcolor>")
End With
End With
|
651
|
Is there any way to change the font for percent value being displayed on the progress bar

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.Bars.Add("Task%Progress").Shortcut = "Percent"
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.35)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercentCaptionFormat,"<b><font Tahoma;12>%%p</font></b>")
End With
End With
|
650
|
How can I horizontally align the caption / percent of a progress-bar

Dim h
With Exg2antt1
.BeginUpdate()
.Columns.Add("Task")
With .Chart
.LevelCount = 2
.set_PaneWidth(False,128)
.FirstVisibleDate = #1/1/2001#
With .Bars.Add("Task%Progress")
.Shortcut = "Percent"
.set_Def(exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True)
.set_Def(exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,1)
End With
End With
With .Items
h = .AddItem("Left")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,0)
h = .AddItem("Center")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,1)
h = .AddItem("Right")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,2)
h = .AddItem("Left")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,0)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.5)
h = .AddItem("Center")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.5)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,1)
h = .AddItem("Right")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,2)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.5)
End With
.EndUpdate()
End With
|
649
|
Is there any way to change the format of the percent being displayed on the progress bar

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.Bars.Add("Task%Progress").Shortcut = "Percent"
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.4)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercentCaptionFormat,"<b>%p/100</b>")
End With
End With
|
648
|
How can I show or hide the percent value in the progress bar

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.Bars.Add("Task%Progress").Shortcut = "Percent"
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.4)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True)
End With
End With
|
647
|
How can I change the percent value in a progress bar

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.Bars.Add("Task%Progress").Shortcut = "Percent"
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.4)
End With
End With
|
646
|
How can I add a percent bar

' BarResize event - Occurs when a bar is moved or resized.
Private Sub Exg2antt1_BarResize(ByVal sender As System.Object,ByVal Item As Integer,ByVal Key As Object) Handles Exg2antt1.BarResize
With Exg2antt1
Debug.Print( Key )
End With
End Sub
Dim h
With Exg2antt1
.BeginUpdate()
.Columns.Add("Task")
With .Chart
.LevelCount = 2
.FirstVisibleDate = #1/1/2001#
.set_PaneWidth(False,64)
With .Bars.Add("Task%Progress")
.Shortcut = "P"
.set_Def(exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True)
End With
End With
With .Items
h = .AddItem("Task 1")
.AddBar(h,"P",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.4)
h = .AddItem("Task 2")
.AddBar(h,"Task%Progress",#1/2/2001#,#1/6/2001#,"K2")
.set_ItemBar(h,"K2",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.15)
End With
.EndUpdate()
End With
|
645
|
How can I fix or lock a specified bar at runtime, in the chart
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanResize,False)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanMove,False)
End With
End With
|
644
|
How can I enabled or disable moving a specified bar at runtime, in the chart
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanResize,False)
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanMove,False)
End With
End With
|
643
|
How can I enabled or disable sizing a specified bar at runtime, in the chart
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanResize,False)
End With
End With
|
642
|
How can I change the key of the bar in the chart
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarKey,"NewK")
.set_ItemBar(h,"NewK",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,.get_ItemBar(h,"NewK",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarKey))
End With
End With
|
641
|
Can I add a bar in the chart, using your EBN files

Dim h
With Exg2antt1
.VisualAppearance.Add(1,"c:\exontrol\images\normal.ebn")
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"",#1/2/2001#,#1/5/2001#,"K1"," EBN ")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarBackColor,16777216)
.AddBar(h,"Task",#1/6/2001#,#1/8/2001#,"K2")
End With
End With
|
640
|
How can I change the background color of the bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.Bars.Copy("Task","TaskR").Color = Color.FromArgb(255,0,0)
With .Items
h = .AddItem("Task 1")
.AddBar(h,"TaskR",#1/2/2001#,#1/6/2001#,"K1")
End With
End With
|
639
|
How can I change the background color of the bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.ShowNonworkingDates = False
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarBackColor,8421504)
End With
End With
|
638
|
How can I change the background color of the HTML text or caption of the bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<bgcolor=FF0000> to do </bgcolor>")
End With
End With
|
637
|
How can I change the foreground color of the HTML text or caption of the bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1","t<fgcolor=0000FF>o</fgcolor> do")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarForeColor,16777215)
End With
End With
|
636
|
How can I change the foreground color of the HTML text or caption of the bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<bgcolor=FF0000> to do </bgcolor>")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarForeColor,16777215)
End With
End With
|
635
|
How can I assign a tooltip to a bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarToolTip,"This is a bit of text that's displayed when the cursor hovers the bar")
End With
End With
|
634
|
How can I vertically align the HTML text or caption of the bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.set_ItemHeight(h,32)
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<bgcolor=FF0000> to do </bgcolor>")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarVAlignCaption,0)
End With
End With
|
633
|
How can I align the HTML text or caption of the bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<bgcolor=FF0000> to do </bgcolor>")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarHAlignCaption,0)
End With
End With
|
632
|
How can I assign a text or some HTML caption to a bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption," <bgcolor=FF0000>to do</bgcolor> ")
End With
End With
|
631
|
How can I change the ending date of the bar in the chart
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarEnd,#1/6/2001#)
End With
End With
|
630
|
How can I change the starting date of the bar in the chart
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarStart,#1/1/2001#)
End With
End With
|
629
|
How can I change the style or the name of the bar in the chart

Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarName,"Progress")
End With
End With
|
628
|
How can I access properties and methods of the bar in the chart
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1")
.set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarName,"Progress")
End With
End With
|
627
|
How can I remove all bars in the item
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1")
.ClearBars(h)
End With
End With
|
626
|
How can I remove a bar from the chart
Dim h
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
h = .AddItem("Task 1")
.AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1")
.RemoveBar(h,"K1")
End With
End With
|
625
|
How can I add a bar and some text inside, in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Task",#1/2/2001#,#1/6/2001#,Nothing," to do ")
End With
End With
|
624
|
How can I add a bar and some text inside, in the chart area
With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Task",#1/2/2001#,#1/6/2001#,Nothing,"<bgcolor=FF0000> to do </bgcolor>")
End With
End With
|
623
|
How can I add an anchor or a hyperline in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"",#1/2/2001#,#1/14/2001#,Nothing,"just a <a1>link</a>")
End With
End With
|
622
|
How can I add some text or captions in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"",#1/2/2001#,#1/14/2001#,Nothing,"just a <b>caption</b>")
End With
End With
|
621
|
How can I add a bar in the chart area

With Exg2antt1
.Columns.Add("Task")
.Chart.FirstVisibleDate = #1/1/2001#
With .Items
.AddBar(.AddItem("Task 1"),"Task",#1/2/2001#,#1/4/2001#)
End With
End With
|
620
|
Is there any option to put a picture or an icon to the thumb part of the scroll bar
With Exg2antt1
.Images("gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _
"lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _
"0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _
"NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=")
.set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exThumbPart,"<img>1</img>")
.set_ScrollThumbSize(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,24)
End With
|
619
|
How can I scroll fast the chart, or page by page

With Exg2antt1
.Images("gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _
"lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _
"0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _
"NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=")
.ScrollHeight = 20
.ScrollButtonWidth = 20
.AllowChartScrollPage = True
.set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exLeftB5Part,"<img>1</img>")
.set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exRightB1Part,"<img>2</img>")
End With
|
618
|
How can I scroll fast the chart, or page by page

With Exg2antt1
.ScrollButtonWidth = 16
.AllowChartScrollPage = True
.set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exLeftB5Part,"<<")
.set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exRightB1Part,">>")
End With
|
617
|
How can I scroll fast the chart, or page by page

With Exg2antt1
.AllowChartScrollPage = True
End With
|
616
|
How can I display years, from 3 to 3
With Exg2antt1
.Chart.UnitWidth = 64
With .Chart.get_Level(0)
.Label = "<%yyyy%>"
.Unit = exontrol.EXG2ANTTLib.UnitEnum.exYear
.Count = 3
End With
End With
|
615
|
How can I display years
With Exg2antt1
.Chart.UnitWidth = 64
With .Chart.get_Level(0)
.Label = "<%yy%>"
.Unit = exontrol.EXG2ANTTLib.UnitEnum.exYear
End With
End With
|
614
|
How can I display years

With Exg2antt1
.Chart.UnitWidth = 48
.Chart.get_Level(0).Label = 0
End With
|
613
|
How can I display months, from 3 to 3
With Exg2antt1
.Chart.FirstVisibleDate = #1/1/2001#
.Chart.LevelCount = 2
.Chart.UnitWidth = 64
.Chart.get_Level(0).Label = 1
With .Chart.get_Level(1)
.Label = "<%mmmm%>"
.Unit = exontrol.EXG2ANTTLib.UnitEnum.exMonth
.Count = 3
End With
End With
|
612
|
How can I display months
With Exg2antt1
.Chart.UnitWidth = 64
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 1
With .Chart.get_Level(1)
.Label = "<%mmmm%>/<%yy%>"
.Unit = exontrol.EXG2ANTTLib.UnitEnum.exMonth
End With
End With
|
611
|
How can I display months

With Exg2antt1
.Chart.LevelCount = 2
.Chart.UnitWidth = 64
.Chart.get_Level(0).Label = 1
.Chart.get_Level(1).Label = 16
End With
|
610
|
How can I display weeks

With Exg2antt1
.Chart.LevelCount = 2
.Chart.UnitWidth = 64
.Chart.get_Level(0).Label = 17
.Chart.get_Level(1).Label = 256
End With
|
609
|
How can I display weeks
With Exg2antt1
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 17
.Chart.get_Level(1).Label = "<%ww%>"
End With
|
608
|
How can I display days, from 2 to 2
With Exg2antt1
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 256
With .Chart.get_Level(1)
.Label = "<%dd%>"
.Count = 2
End With
End With
|
607
|
How can I display days

With Exg2antt1
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 256
.Chart.get_Level(1).Label = "<%dd%>"
End With
|
606
|
How can I display days

With Exg2antt1
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 256
.Chart.get_Level(1).Label = 4096
End With
|
605
|
How can I display hours, from 6 to 6

With Exg2antt1
.Chart.FirstVisibleDate = "00:00"
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 4096
With .Chart.get_Level(1)
.Label = "<%hh%>"
.Count = 6
End With
End With
|
604
|
How can I display hours

With Exg2antt1
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 4096
.Chart.get_Level(1).Label = "<%hh%>"
End With
|
603
|
How can I display hours

With Exg2antt1
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 4096
.Chart.get_Level(1).Label = 65536
End With
|
602
|
How can I display minutes, from 15 to 15

With Exg2antt1
.Chart.FirstVisibleDate = "00:00"
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 65536
With .Chart.get_Level(1)
.Label = "<%nn%>"
.Count = 15
End With
End With
|
601
|
How can I display minutes

With Exg2antt1
.Chart.LevelCount = 2
.Chart.get_Level(0).Label = 65536
.Chart.get_Level(1).Label = "<%nn%>"
End With
|